MVP Sprint Standard
Outpace the Market.
6-flow production V1 with custom design system. 6 weeks.
actually get
Funded founder (pre-seed to Series A), 4–6 critical flows, validated demand, production V1 in six weeks. The Standard tier is the Wintura.ai playbook applied to your domain — custom design system, full admin panel with ops + reporting, multi-tenant Row-Level Security, Playwright e2e + axe-core a11y, Sentry + PostHog wired.
Same architecture, same rigor, same operational rhythm that shipped wintura.ai. By Friday of week 6 you have production code on Vercel, a runbook, an architecture doc, and 30 days of free bug fixes.
Hard limits
- Core user flows≤ 6
- Design systemCustom (built, not template)
- Admin panelFull (ops + reporting)
- AI featuresNone (upgrade to Plus for 1)
In every MVP Sprint Standard
- Everything in MVP Sprint Lite
- 6 core user flows (vs 3)
- Custom design system + brand application
- Full admin panel with ops + reporting
- Analytics (PostHog) + error tracking (Sentry)
- Multi-tenant Row-Level Security
- Playwright e2e + axe-core a11y matrix
- 30-day post-launch fix window
Explicit exclusions
- 7+ flows in v1 (we'll bow out or scope custom)
- AI / LLM features (upgrade to Plus)
- Native mobile apps (responsive web only)
- Ongoing product management (you own roadmap post-launch)
- Compliance certifications
Opinionated by default
One default stack for 80% of builds. Same stack shipped wintura.ai. Same stack the architect knows cold and has a runbook for at 3 a.m. When you swap pieces, the timeline goes up — the scoping call surfaces the swap before work starts.
Operational rhythm
Not a process for show — the scaffolding that keeps a fixed-price engagement on track when life happens. Same rhythm across every Lift, Sprint, and Pod.
Daily commits
Every weekday, to a branch you can pull and run locally.
End-of-day async videos
3–5 min Loom summarizing decisions and blockers — review on your schedule.
Friday demo on Zoom
30 min walkthrough of what shipped that week — questions answered live.
Slack-first, decisions in 24h
Our workspace and yours linked. Questions get answered in a day, both directions.
Concrete deliverables
No slide deck. No "phase 2 proposal." The list below is what hits your repo, your inbox, and your stack on the last day of the engagement.
Most agencies say "fixed price" and reserve the right to add a change order the moment the brief shifts. Soatech doesn't.
The way fixed price stays honest is by being unreasonable about scope. The scoping doc lists every flow, every screen, every integration. If something isn't on that list, it isn't in this engagement. If you discover during the build that you need it, the current scope ships as planned, and v1.1 begins after handoff — at the next tier's price, or as a follow-on Feature Sprint.
This sounds rigid. In practice founders consistently report it's the most valuable thing about the process — the discipline of saying "v1.1" thirty times across six weeks is what keeps the timeline honest.
Funded founders (pre-seed to Series A) with 4–6 critical flows. Teams replacing a no-code prototype with production code.
Bootstrapped solo founders with <4 flows (use Lite). Teams needing AI features (use Plus). 7+ flows (scope custom).
Upsell trigger: Need 1 AI/LLM-powered flow → MVP Sprint Plus → MVP Sprint Plus
Related from the blog
The Wintura Playbook — Exactly How I Ship Production MVPs at Soatech
Day-by-day walkthrough of the 30-day MVP Sprint process Soatech runs, derived from the actual Wintura.ai build (Next.js 16, Claude Sonnet 4.6, multi-tenant Postgres, 24 e2e tests).
How Much Does It Cost to Build a SaaS Platform in 2026?
SaaS platform cost breakdown by complexity: simple ($30-70K), mid-range ($70-200K), enterprise ($200K+). Features, hosting, and ongoing costs explained.
The Complete MVP Development Checklist for 2026
A step-by-step guide to building your Minimum Viable Product. From validation to launch, avoid the most common mistakes that kill MVPs before they start.
Skip the sales reps. Book the Architect directly.
30 minutes. Scope your project with a senior architect — the same studio that shipped wintura.ai. Your assigned architect is confirmed after scope sign-off.
30-min Blueprint scoping call
Direct line to the Architect. No SDR. No nurture sequence. Confirmed within 24 hours.
- CET available · async time-zone friendly
- Calendar invite + Google Meet auto-sent
- Blueprint fee converts to Sprint One
- 30 minutes · free