MVP Development Checklist: Validation, Scope, Build and Launch
By Alvi Lika, Founder, Soatech
· · 10 min read
A checklist for planning an MVP: validate the problem, cut scope, pick a boring stack, build the critical path and prepare launch. Where production readiness begins.
What this checklist covers
This is a planning checklist for a minimum viable product: deciding what to test, what to build, and what has to be true before real users arrive. It is deliberately tool-agnostic.
It is not a security or production-readiness review of an existing codebase. If you already have a working app built with Lovable, Bolt, v0, Replit or Cursor and the question is "is this safe to put in front of customers?", use the tool-specific checklists linked in the production readiness section further down instead.
Most MVPs that stall do so for ordinary reasons rather than technical ones:
- Too much scope. It is not "minimum" if it has fifteen features.
- No clear audience. Building for everyone means no one feels the product was made for them.
- No success measure. If you cannot say what result would change your plan, you cannot learn from the launch.
AI app builders have added a fourth: a prototype that looks finished in a demo but has not been checked for the things real users depend on, such as authentication, data access rules and backups.
Phase 1: Validation before writing code
- Write down the core hypothesis. Which problem, for whom, and what they do about it today.
- Talk to at least ten potential users. People who have the problem, not friends being polite.
- Pick one key metric. The single number that tells you whether the MVP is working.
- Check the alternatives. What exists today, and why would someone switch?
- Test willingness to pay. A pre-order, a paid pilot or a signed letter of intent says more than "I'd use that".
If you already have a prototype
A clickable prototype is useful validation evidence. Before treating it as the MVP, answer these honestly:
- Is there real authentication, or does the app trust whoever opens it?
- Can one user read or change another user's data? Try it with two test accounts.
- Are any secrets in client-side code (API keys, service-role keys)?
- Does the data model match the business, or did it grow screen by screen?
If any answer is "no" or "I don't know", the prototype needs production work before it is an MVP. That work is covered by the production readiness checklists below, not by this planning list.
Phase 2: Scope definition
The one-feature test
If your product could only do one thing, what would it be? That is the MVP. Everything else goes on a "later" list and stays there until after launch.
- One core user flow defined — a single path from sign-up to the moment the user gets value.
- A short must-have list — if it runs past five items, challenge each one.
- A written "won't do" list — what you are explicitly not building.
- User stories for each must-have — "As a [user], I want [action], so that [benefit]".
- Acceptance criteria for each story — how you will know it is done. How to scope a software project has a worked example.
Prioritise with MoSCoW
MoSCoW sorts every candidate feature into Must, Should, Could or Won't have. It makes trade-offs explicit instead of leaving them as a feeling.
- Must have — without it the product does not work. Test: remove it mentally. Can a user still get value? If yes, it is not a must-have.
- Should have — important, but the product can launch without it.
- Could have — dark mode, PDF export, notification preferences. They feel important in planning and rarely decide adoption.
- Won't have (this time) — written down so that "wouldn't it be great if…" has an answer.
Keep the must-haves well below the effort you actually have, so there is room when estimates slip. First-pass lists tend to put too much in Must, so run the removal test on each item a second time.
Worked example: 28 features down to 4
Illustrative example. A project management tool for small creative agencies starts with 28 candidate features: time tracking, invoicing, client portal, task management, Gantt charts, team calendar, file sharing, Kanban boards, budget tracking, resource allocation, templates, recurring tasks, custom fields, three third-party integrations, reports, a mobile app, real-time collaboration, comments, notifications, role-based permissions, white-labelling, API access, multi-currency, tax calculation, approval workflows, guest access, milestones and dashboards.
Four survive as must-haves:
- Task management — create, assign and complete tasks within projects.
- Kanban view — the visual workflow agencies already use.
- Basic time tracking — start/stop timer on a task, the differentiator from generic tools.
- Client view — a read-only link showing project progress.
Those four test the hypothesis — "do creative agencies want project management with built-in time tracking?" — with a fraction of the build. The other 24 wait for evidence.
The AI-builder scope trap
AI builders make adding screens almost free, so prototypes tend to grow sideways. A useful rule: if the core flow needs more than about five screens, cut before you harden anything. Every extra screen is extra auth, validation and testing work later.
Phase 3: Technical decisions
Choose boring technology
An MVP is not the place to try a new framework. Pick tools with large ecosystems and people you can hire:
| Layer | Common choice | Why |
|---|---|---|
| Frontend | Next.js or React | Large ecosystem, easy to hire for |
| Backend | Node.js or Python | Fast development, mature libraries |
| Database | PostgreSQL | Relational, well understood, many managed hosts |
| Hosting | Vercel, Railway or similar | Push-to-deploy, preview environments |
| Auth | A managed provider or a maintained library (Clerk, Auth0, Supabase Auth, Auth.js) | Don't build authentication from scratch |
| Payments | Stripe | Mature APIs and documentation |
Architecture checklist
- Monolith first. Microservices solve scaling problems you don't have yet.
- Use a component library or CSS framework rather than designing every element.
- CI/CD from day one — automated checks and push-to-deploy before feature work starts.
- Error monitoring (Sentry or similar) so you know when things break.
- Product analytics (PostHog, Mixpanel, Amplitude) wired to your one key metric.
Phase 4: Development
Short iterations with a demo at the end keep scope honest. A two-week rhythm is common: plan at the start, a short daily check on blockers, and a demo plus retrospective at the end. What matters is that someone outside the build sees working software regularly.
- A working deployment pipeline before feature code.
- Basic logging and monitoring in place.
- Responsive layout from the start, not retrofitted.
- A performance budget — for example, Core Web Vitals in the "good" range on a mid-range phone.
- Security basics — HTTPS, server-side input validation, authorisation checks on every protected route.
- Automated tests for the critical path — sign-up, the core flow and payment. Not 100% coverage; the paths that would hurt most if they broke.
Where this checklist stops: production readiness
An MVP plan tells you what to build. Production readiness asks whether what you built can be trusted with real users and real data. They overlap, but they are different reviews, and the second depends on the tool and stack you used.
| Aspect | Typical prototype | What production needs |
|---|---|---|
| Authentication | Mock or minimal | Real sessions, password reset, expiry |
| Data access | Whatever the generator produced | Authorisation tested with at least two accounts; database policies reviewed if you rely on them |
| Errors | Console output | Structured logs and error tracking |
| Data safety | None | Backups, with a restore actually tested |
| Testing | Manual clicking | Automated end-to-end tests on critical paths |
| Deployment | Builder-hosted | A pipeline and environments you control |
For the detailed review, use the checklist that matches your build:
- Lovable to production checklist
- Cursor security review checklist
- Supabase RLS leaks in Bolt and Lovable apps — including why row-level security is not an unconditional guarantee
- Replit Agent to production
Not sure what your prototype is missing before launch?
Phase 5: Launch and learn
Pre-launch sweep
Most launch problems are process gaps — a missing policy, an unmonitored error, a payment flow nobody tested with a real card — rather than hard engineering.
Technical
- HTTPS enforced;
http://redirects. - Sign-up, login, logout, password reset and session expiry tested end to end.
- No secrets in the codebase or Git history.
- CORS restricted to your own domains.
- Error pages don't leak stack traces or internals.
- Dependencies audited (
npm auditor equivalent); critical and high issues resolved. - Security headers set (CSP, X-Frame-Options or
frame-ancestors, X-Content-Type-Options). - Tested on real iOS and Android devices, not only browser emulation.
- Production environment separate from development.
- Backups configured and a restore tested.
Monitoring
- Error monitoring active and alerting someone.
- Uptime monitoring with alerts to a channel someone reads.
- Analytics events on key actions confirmed firing, not just installed.
Marketing and product
- Landing page with a clear statement of who it is for and what it does.
- Meta tags and an Open Graph image on public pages.
- Sitemap and robots.txt in place.
- UTM-tagged links ready before you announce — attribution can't be added afterwards.
- Onboarding tested with at least three people who haven't seen the product.
- A way for users to send feedback.
Legal and operations
- Privacy policy and terms published, written for what the product actually does with data.
- Cookie consent where the law requires it, with no non-essential cookies before consent.
- Payment flow tested with live credentials: webhooks, receipts and refunds. Test mode alone is not enough.
The first two weeks after launch
- Watch your key metric daily.
- Talk to every early user — what confused them, what they expected to find.
- Fix critical bugs immediately.
- Resist adding features until you understand how the current ones are used.
- Write down what you learned — which assumptions held and which didn't.
Budget for what comes after
An MVP is the start of running software, not the end of a project. Hosting, third-party services, dependency updates, security patches and bug fixes continue after launch, whoever builds the first version. What it costs to maintain an app after launch breaks those categories down.
Getting help with the production side
If you are still at the idea stage, the checklist above is work you can do yourself, and the first useful step is talking to users rather than hiring anyone.
If you have a working prototype and need to know what stands between it and real users, a Production Audit (€1,500, 3–5 working days) gives you a written diagnosis without code changes. Where the gap is a bounded, well-defined set of fixes, Prototype to Production (€3,500, about a week) works from a written baseline scope. Both start with a scoping call.
Working on a feature this article touches? A 30-minute call is the quickest way to scope it.