How to Scope a First AI Feature Release Without Overbuilding
By Alvi Lika, Founder, Soatech
· · 10 min read
A scope document for a first AI feature release: the problem, the boundaries, acceptance criteria an engineer can test, what is out of scope, and how changes are handled.
A scope document has one job: let the person paying and the person building agree, before work starts, on what "done" means and what is deliberately left out. If two reasonable people can read it and come away with different estimates, it is not finished.
That matters more for an AI feature than for an ordinary form or dashboard, because model output varies. "Summarise the ticket" can be tested in a demo by eye. It cannot be accepted in production without a written answer to: summarised how well, on which inputs, how fast, at what cost per request, and what happens when the model is wrong.
This article walks through how to scope a first AI feature release, and ends with a complete sample document you can adapt.
A note on the failure statistics
Articles about scoping usually open with a project-failure rate. The most quoted source is the Standish Group CHAOS report. Its figures are paywalled, and its definition of success has been criticised in peer-reviewed work: Eveleens and Verhoef applied the Standish definitions to 5,457 forecasts across 1,211 real projects and found the definitions judge projects mainly on how well they matched their initial estimates of cost, time and functionality (IEEE Software, 2010).
That criticism is itself the useful point. If "failure" mostly means "missed the first estimate," then the lever you control is the quality of the thing being estimated: the scope. You don't need a headline percentage to act on that.
Start from the decision, not the feature list
Write down three things before any feature appears on the page:
- The user and the moment. Not "support teams" but "a support agent with an open ticket that has more than five messages."
- What they do today. Read the whole thread, then write an internal note by hand. This is your baseline, and the AI feature has to beat it.
- How you will know it helped. Pick something you can observe after release: agents accept the draft without major edits, or time to first internal note drops. If you cannot name a signal, you are not ready to scope.
Everything that does not serve that one user in that one moment goes to a later list. For a first AI release, one workflow is usually the right size. Two workflows means two evaluation sets, two prompt designs and two sets of failure modes.
Write the boundaries an AI feature needs
An ordinary feature spec covers screens, data and permissions. An AI feature also needs these, written down:
| Boundary | Question the scope must answer |
|---|---|
| Inputs | Which data the model sees, maximum size, and what is stripped out first (attachments, personal data, secrets) |
| Output shape | Free text, or a fixed structure the application can validate |
| Quality bar | Measured on what set of examples, judged by whom, with what pass mark |
| Failure behaviour | What the user sees when the model times out, refuses, or returns something invalid |
| Human control | Whether output is a draft a person approves, or acts on its own |
| Tenant isolation | How the feature is prevented from reading another customer's data |
| Cost and latency | A per-request budget and a time limit |
| Abuse | What happens when a user, or a document the model reads, tries to change its instructions |
The last row is the one most often skipped. The OWASP list of risks for LLM applications puts prompt injection first (OWASP Top 10 for LLM Applications, 2025). For a first release, the practical answer is usually to limit what the model can do: it drafts text, it does not send email, change records or call other tools.
On output shape: a fixed structure is much easier to accept than free text. Model providers now support schema-constrained output. Anthropic's API, for example, can constrain a response to a JSON schema through output_config.format, with documented exceptions such as refusals and responses cut off at the token limit (Claude structured outputs). Those exceptions belong in the scope as failure cases.
Acceptance criteria an engineer can test
Each criterion should be something a reviewer can check and record as pass or fail. "Summaries are accurate" fails that test. "On the 50-ticket evaluation set, a reviewer marks at least 45 summaries as having no factual error" passes it.
Some guidance from building this kind of pipeline:
- Separate deterministic criteria from judged ones. Schema validity, latency, tenant scoping and error handling can be automated tests. Quality needs a fixed evaluation set and a named reviewer.
- Agree the evaluation set before the build starts. If the examples are chosen after the prompt is written, the pass mark means nothing. Use real, anonymised inputs and include the awkward ones: very long threads, mixed languages, angry customers, empty fields.
- Write the failure path as a criterion. "If the model call fails, the agent sees 'Draft unavailable' and the ticket is unaffected" is testable. Silence is not.
- Keep a person in the loop for anything consequential. In Wintura, generated proposals that fail an automated quality check are held in a
needs_reviewstate instead of being sent, and commercial conflicts the model notices (a deadline that cannot be met, a price above the stated budget) are stored as advisories for a person to resolve. The model flags; a person decides.
A sample scope document
Illustrative example: a B2B helpdesk product adding its first AI feature. The product, numbers and names are hypothetical; the structure is the part to copy.
# Scope: Ticket summary draft (release 1)
## Problem
Support agents on tickets with 5+ messages spend time re-reading the thread
before writing an internal handover note. Release 1 drafts that note.
## User and trigger
- User: support agent with "agent" role, on a ticket they can already view.
- Trigger: agent clicks "Draft summary". Nothing runs automatically.
## In scope
1. "Draft summary" button on the ticket view for tickets with 5+ messages.
2. Server-side call to the model with the ticket's messages only
(no attachments; email addresses and phone numbers masked before sending).
3. Structured output: { issue, steps_taken[], customer_sentiment, open_question }.
Output that fails schema validation is discarded, not shown.
4. Draft appears in the internal-note editor, editable, clearly labelled
"AI draft". Nothing is saved until the agent saves the note.
5. Usage log per request: tenant id, ticket id, latency, token counts, outcome.
No message content stored in the log.
## Acceptance criteria
A1 Tenant scoping: an automated test proves a request for a ticket in tenant B,
made with a session from tenant A, returns 404 and makes no model call.
A2 Schema: 100% of displayed drafts pass schema validation (enforced in code).
A3 Quality: on the agreed 50-ticket evaluation set, the product owner marks
>= 45 drafts as "no factual error" and >= 40 as "usable with minor edits".
A4 Latency: p95 under 8 seconds from click to draft on the evaluation set.
A5 Cost: average model cost per draft under $0.02 on the evaluation set,
measured from API token counts.
A6 Failure path: on timeout (10 s), provider error or invalid output, the agent
sees "Draft unavailable, write the note as usual" and the ticket is unchanged.
A7 Injection: a ticket containing "ignore previous instructions and..." text
produces a normal summary or the failure message; the feature has no ability
to send, edit or delete anything.
A8 Permissions: users without the "agent" role do not see the button (UI) and
receive 403 from the endpoint (server).
## Out of scope for release 1
- Automatic summaries on every ticket, or background processing.
- Suggested customer replies.
- Attachments, images, voice.
- Languages other than English and German.
- Fine-tuning or a custom model.
- Analytics dashboard for usage (raw usage log only).
## Assumptions
- Product owner supplies 50 anonymised tickets for the evaluation set by day 3.
- One model provider; the existing provider agreement covers this data.
- Staging environment with production-like data volume is available.
## Change control
Any change to "In scope", acceptance criteria or assumptions is written as a
change note: what changes, effect on effort and dates, what moves out to make
room. Work on a change starts only after both sides approve the note.
Two things to notice. First, the "Out of scope" list is as long as the "In scope" list. That is normal for a first release, and it is the section that prevents the most arguments later. Second, every acceptance criterion names how it will be checked. A3 depends on a person's judgement, so it names the person and the examples.
Keep the document small enough to read
A first-release scope like the one above fits on two pages. If yours is running to thirty, it usually means one of three things: several releases are hiding inside it, it describes implementation details the builder should decide, or it is trying to cover every edge case up front. Move the later releases to a separate list, delete the implementation detail, and turn the edge cases into either an acceptance criterion or an explicit out-of-scope line.
The same discipline applies to non-AI parts of the product. User stories ("as an agent, I can…, so that…") are a fine way to draft scope, but they are only estimable once each one has acceptance criteria. "Admin dashboard" can be two days or two months; "an admin can export today's tickets to CSV with these six columns" cannot.
Handle change without pretending it won't happen
Scope changes during almost every project, especially once real model output is visible. The goal is not to prevent change but to make every change explicit:
- Write it down. A change note says what is added, what it costs in time, and what leaves the release to make room, if anything.
- Decide before building. No change starts on the strength of a chat message.
- Keep a later list. Good ideas that arrive mid-release go on it, with a date to review them. Most look different once the first release is in users' hands.
How a change affects price depends on the contract model. The trade-offs are covered in fixed price vs time and materials.
When you don't have enough to scope yet
Sometimes the honest answer is that a scope document cannot be written yet: the evaluation examples don't exist, nobody knows which data the model may legally see, or the existing codebase has not been reviewed. Estimating on top of that produces a number that will be missed.
In that situation, spend a small amount on finding out first. If there is an existing codebase, a written diagnosis of it is often the right first step. Soatech's Production Audit is one version of that: €1,500, three to five working days, a written report and no code changes. If the codebase is in reasonable shape and the question is only "what exactly are we building," a scoping call and a document like the one above may be enough.
Want a second pair of eyes on an AI feature scope before you commit?
If the scope is clear and you want it built and shipped inside your own repository, that is what the Embedded Architect engagement is for.
Working on a feature this article touches? A 30-minute call is the quickest way to scope it.
Discuss your project